Florida Department of Environmental Protection Florida Department of Environmental Protection  
MyFlorida.com  

This data is current as of: April 28, 2015

Clear Dot Image
Select a Permit Type to View Specific Information
Permit Type
Total Under Review
Air - Construction Permit  
59
Air - Federally Enforceable State Operating Permit (FESOP)  
3
Air - General Permit  
33
Air - Operation Permit  
21
Air - Title V Operation Permit  
52
Construction Generic Dewatering Large  
5
Construction Generic Dewatering Small  
3
Corrective Action Permit Only  
1
Domestic Wastewater Biosolids  
5
Everglades - ERP Noticed General Permit  
1
Everglades - ERP SGP No Conceptual Approval Permit  
1
Everglades - IW Group 7A, Design Daily Flow >500,000 GPD Permit  
11
Everglades - Individual With No Conceptual Approval Permit  
1
Everglades CERPRA-CE  
10
Everglades EFA-EF  
1
Everglades Lake Okeechobee-LO  
2
Fullers Earth Reclamation  
1
IW Dewatering Operations  
12
Joint Application Electronic Submittal  
6
Oil and Gas Permit  
3
Phosphate Reclamation  
3
Stormwater - Large Construction (>= 5 AC)  
4
Stormwater - Multisector Generic Permit  
3
Stormwater - Municipal Separate Storm Sewer Systems  
3
Stormwater - No Exposure Certification  
1
Stormwater - Small Construction (1-5 AC)  
6
Waste - Hazardous Waste Operation Permit  
8
Waste - Solid Waste Closure Permit  
6
Waste - Solid Waste Construction Permit  
4
Waste - Solid Waste Operation Permit  
28
Waste - Waste Tire Permit  
6
Water - Beaches CCCL General Permit  
3
Water - Beaches Construction Individual Permit  
153
Water - Beaches ERP Individual Permit  
2
Water - Beaches ERP Minor Modification  
2
Water - Beaches Exemption  
1
Water - Beaches JCP Minor Modification  
10
Water - Beaches Variance  
1
Water - Domestic Wastewater Collection/Transmission System  
89
Water - Domestic Wastewater Facility Permit  
10
Water - Domestic Wastewater Type I Facility Permit  
8
Water - Domestic Wastewater Type I Reuse/Land Application System Permit  
2
Water - Domestic Wastewater Type I Wastewater Treatment Plant Permit  
23
Water - Domestic Wastewater Type II Wastewater Treatment Plant Permit  
12
Water - Domestic Wastewater Type III (less than 10,000 gpd) Wastewater Treatment Plant Permit  
7
Water - Domestic Wastewater Type III Facility Permit  
1
Water - Domestic Wastewater Type III Wastewater Treatment Plant Permit  
31
Water - Dredge and Fill Permit  
3
Water - Drinking Water Distribution System General Permit  
46
Water - Drinking Water Distribution System Permit  
5
Water - Drinking Water Treatment Construction Permit  
13
Water - ERP Exemption Permit  
238
Water - ERP Formal Determination  
51
Water - ERP Modifications  
50
Water - ERP Noticed General Permit  
72
Water - ERP Variance  
1
Water - Individual Stormwater System Permit  
1
Water - Individual With No Conceptual Approval Permit  
231
Water - Industrial Wastewater Concrete Batch Plant Permit  
9
Water - Industrial Wastewater Facility Permit  
4
Water - Industrial Wastewater Group 1, Non-surface Water Discharge Permit  
3
Water - Industrial Wastewater Group 1, Surface Water Discharge Permit  
15
Water - Industrial Wastewater Group 10B - Other Facility Permit  
1
Water - Industrial Wastewater Group 3, Surface Water Discharge Permit  
2
Water - Industrial Wastewater Group 4A, Feedlots W/> Than Number Of Listed Animals Permit  
3
Water - Industrial Wastewater Group 5A, Design Daily Discharge >500,000 GPD Permit  
1
Water - Industrial Wastewater Group 6A, BTU/HR Heat Loss >100 Million Permit  
2
Water - Industrial Wastewater Group 6C, >1 Million BTU/HR Heat Loss Up to 20 Million Permit  
1
Water - Industrial Wastewater Group 6D, 1 Million BTU/HR Heat Loss or Less Permit  
1
Water - Industrial Wastewater Group 7A, Design Daily Flow >500,000 GPD Permit  
3
Water - Industrial Wastewater Group 7B, Design Daily Flow >100,000 Up to 500,000 GPD Permit  
2
Water - Industrial Wastewater Group 7C, Design Daily Flow >50,000 Up to 100,000 GPD Permit  
1
Water - Industrial Wastewater Group 7D, Design Daily Flow 50,000 or Less GPD Permit  
1
Water - Industrial Wastewater Group 8C, Design Daily Flow >50,000 to 100,000 GPD Permit  
3
Water - Industrial Wastewater Group 8D, Design Daily Flow of 50,000 or Less GPD Permit  
1
Water - Industrial Wastewater Group 9B, Recycling 10,000 or Less GPD Permit  
3
Water - Industrial Wastewater Petroleum Cleanup Site Permit  
1
Water - Injection Well Construction Permit  
93
Water - Injection Well Operation Permit  
20
Water - Injection Well Permit  
8
Water - Joint Coastal Permit  
22
Water - Mangrove Alterations Permit  
22
Water - Mangrove Exemptions  
2
Water - Mitigation Bank Permit  
4
Water - Underground Injection Control - Construction/Operation Permit  
1

Contact The Office of Public Services whenever you have questions or concerns about the permit data.